Fire Door Remedial Works Carried Out to Restore Fire Resistance and Prevent the Spread of Fire and Smoke Through Compartment Lines

fire door remedial

We start every remedial programme by validating the inspection report — re-surveying a sample of doorsets to confirm the reported defects and identifying anything missed. From there, we work through the remediation schedule in priority order: fire-critical defects first (gap excesses, missing intumescent, broken closers), then secondary defects (signage, vision panel failures, hinge issues), then finishing.

Where a doorset cannot be safely remediated — typically because the leaf is non-certified, the frame is structurally damaged, or the original installation was so far outside the tested scope that no repair will restore the rating — we replace the full doorset and certify it from new.

Our Capability Includes

Our Delivery Process

Step 1
Validation & Survey
We re-survey representative doorsets to validate the inspection report, identify missed defects, and assess site access requirements before works begin.
Step 2
Remedial Planning
A prioritised remedial schedule is prepared, addressing fire-critical defects first and organising works around agreed access windows.
Step 3
Remedial Works & QA
All corrective works are completed, photographed before and after, and independently re-inspected by accredited operatives for quality assurance.
Step 4
Certification & Closing Report
A complete closing report is issued with updated doorset registers, photographs, certificates, and records of all corrective actions completed.

Frequently Asked Questions

Can every failed fire door be remediated?

Ans. Most can. Around 80–90% of inspection failures we see are minor and remediable. The remainder usually need full doorset replacement because the leaf is non-certified or the frame is too damaged to bring back into tested tolerance.

Ans. Only if the remedial is carried out outside the doorset’s tested scope. That’s exactly why remedials should be done by a Q-Mark-accredited installer using manufacturer-approved components.

Ans. Typically within ten working days of instruction for smaller schemes and two to three weeks for larger programmes requiring resident liaison or out-of-hours access.

Got an inspection report you need closed out? Send it through and we'll come back with a fixed-price remedial schedule within five working days.